News
On time shipment – CCEFIRE high aluminum fire brick
Dec. 16, 2019
Custom CCEFIRE high aluminum fire brick, CCEWOOL ceramic fiber paper and cloth have been shipped in a timely manner.
Read More
Guidelines for insulation rock wool board installation
Dec. 11, 2019
The surface of the facility or the pipe which needs to have insulation rock wool board installed should be kept constantly dry with no leak or grease. Applying coatings when necessary.
Read More
On time shipment – CCEWOOL insulation ceramic board
Dec. 10, 2019
CCEWOOL insulation ceramic board has been shipped in a timely manner.
Read More
The installation techniques of insulation ceramic blanket
Dec. 06, 2019
Insulation ceramic blanket, also known as alumina-silica ceramic fiber blanket, has two different types – blown fiber and spun fiber. Due to its longer fiber and lower coefficient of thermal conductivity, spun fiber does a better job when it comes to thermal insulation.
Read More
On time shipment – CCEWOOL insulation ceramic fiber board
Dec. 02, 2019
CCEWOOL insulation ceramic fiber board has been shipped in a timely manner.
Read More
On time shipment – CCEWOOL high temperature refractory brick
Nov. 18, 2019
CCEFIRE high temperature refractory brick and CCEWOOL ceramic fiber paper were shipped to South Africa in a timely manner.
Read More