Double Egret Thermal Insulation Co., Ltd. Double Egret Thermal Insulation Co., Ltd.

Home News Contact Us

ramic Fiber Energy-Saving Solutions
Customer Feedback

News

Home > News

Construction metod of CCEWOOL rock wool insulation board 2

Mar. 12, 2018

During construction of external insulation rock wool board, when temperature is lower than 5℃ construction should be stopped.

Read More

Construction method of CCEWOOL rock wool insulation board

Mar. 06, 2018

Manufacturer of rock wool insulation board external wall insulation system should send professional personnel for on the spot guidance during the construction process. And cooperate with the construction unit and the site supervision to do construction quality control work.

Read More

Analysis of factors that affect the performance of insulation ceramic fiber products

Feb. 26, 2018

Insulation ceramic fiber products used in different conditions, its long term using temperature is different.

Read More

Key points in construction of insulation calcium silicate board

Feb. 05, 2018

Insulation calcium silicate board product is crystallization composite material produced by dynamic heating gel process and it is strictly forbidden to calcinate.

Read More

The way to build warm insulating bricks' refractory insulation layer that contact the fire

Jan. 29, 2018

Warm insulating bricks' clay is quickly dried and burned after solidification. The burnt products are machined to make the desired shape and size.

Read More

CCEWOOL as calcium silicate board supplier briefly discuss its construction methods

Jan. 22, 2018

Special remind from CCEWOOL as calcium silicate board supplier: the cutting and processing of calcium silicate plate should use wooden saw or iron saw. Tools such as cleaver, single blade hammer should not be used.

Read More

Contact Us