Last week we introduced some construction method of rock wool insulation board, this week we will continue to introduce construction method of CCEWOOL rock wool insulation board.
6. During construction of rock wool insulation board, when temperature is lower than 5℃ construction should be stopped. No construction shall be carried out when wind category is over 5 or in rain or snow weather.
7. Before large scale construction, the same material should be used at site. make model wall according to structure and construction method, and after the relevant parties confirm that the construction can be carried out.
8. In the construction of rock wool insulation board, the operator should wear good protective equipment, do well in occupational health protection, and pay attention to construction safety.
9. The material of the external thermal insulation system of rock wool insulation board should be tested by qualified testing institutions and can only be used after passed the test.
10. The pasting of rock wool insulation board should adopt stick method or point stick method.The sticking area should not be less than 50%. After rock wool insulation board is applied with adhesive, should first paste insulation board bottom at the grass-roots level. Rock wool insulation board should be laid along the horizontal direction from bottom to top. And the board should be anchored while being paved. The board joint should be natural and two boards should be close.Gap between boards shall not be greater than 2 mm. If the seam is 2 mm wide. Heat preservation material should be filled into gap. Adjacent panel should be flush, elevation difference between plate shall not be greater than 1.5 mm.
11. For all pipes and components that go through rock wool insulation board, its outlet part should be filled compact with the same material and must be processed with water proof sealing treatment.
12. If the veneer layer is found to fall off during the construction process, it shall be fixed in a timely manner by fixing with anchoring parts or sticking. And exterior finish construction should be carried out in a timely manner.
Above is part of construction method of CCEWOOL rock wool insulation board. Hope this can bring help to furnace builders and workers. Next week we will continue to introduce construction method of rock wool insulation board.